Thursday, November 25, 2010
The painting has begun ...
Rooms with a View
We are incredibly lucky that we get some amazing views from our house - see below!
The long awaited gib stopping pics
Tuesday, November 2, 2010
is it time to stop?
Yes dear Crosie has finished all the contstruction and now its onto the gib-stopping. A job that he doesn't like, but from what is on the walls, looks pretty good to me!
We are concentrating on getting the lounge, living, study, entrance and our bedroom done first, so we can move in. Plus we have to ge the living area done so Mr Kitchen man can come and install our kitchen - how cool is that going to be!!!
We now have both power and gas on to the house now, not just an extension cord running between the buildings - a little more secure methinks.
This also means we can have a lovely bath in our wonderful bathroom - though the cats are a little curoius as to why we want to sit in water.
A quick cat story: after spraying a mound of dirt with weedkiller, little white fluffy and the ginja ninja were playing in it, which meant that the little white fluffy was rolling around in weedkiller. Long story short Crosie turned on the shower and he and the little white fluffy had a shower together! Poor wee fluffy was like a drowned rat, oddly though he was quite relaxed about the whole affair and has since got back into the shower, albeit it wasn't on, but he got in voluntarily!
Gib stopping pics will be loaded in the next day or so!
Tuesday, October 5, 2010
A-gibbing we will go ...
Though with 2.7m stud's it's not as easy as it sounds. But while I thought those ceilings were high, i wasn't prepared for the knee-knocking that would happen in the lounge and living areas!
Crosie and i managed the lounge gib by ourselves. Something like 4.8m sheets that we had to get to a height of over 3 metres. However, that wasn't the worst of it .. we had to get sheets over 5.3 m to a height of 4.5m for the living room ceiling! See below:
Thankfully we had help for all but the last sheet and a half. How Crosie and i managed to get a full-size sheet up i am not sure, but my shoulders are incredibly sore!
All but the garage ceiling to do now, then it's gib-stopping and then painting and then installing all the electrics.
Speaking of electrics here is an example of all the wiring that is in the walls:
The other exciting addition so far is that i have a laundry inside where it is supposed to be - and no longer requires a hose across the driveway from the manspace - very exciting
Tuesday, September 7, 2010
We're just batts!

Wednesday, August 25, 2010
We are clad!
Yes folks happy to report that Crosie has finished the cladding the house - including putting up the garage door!
It's all very exciting as the house is now full of gib board and pink batts all ready to install. The end is nearing and we are hoping that in 6 - 8 weeks we will be moving on in!
In some of the photos with this post you will see the sheep - very exciting as we await the arrival of some lambs! Though as Crosie is away this week I am hoping that the girls cross their legs until he returns.
Crosie is down in Lake Hawea helping his mum celebrate a birthday - Happy birthday! he is also looking a possible new addition to our household - a puppy. but that is a wait and see
Enjoy the latest pics!
1. View from Master Bedroom side 2. View from spare room side
3. View as you drive in 4. Similar view
5. View from paddock!





















